Project Name: Design, Supply, Installation, Testing and Commissioning for The 30 MWp Solarization of 2 x 60MVA Transmission Substation at Kabba, Kogi State
Scope of work: 30 MWP Solar Panels with all electrical and civil works to complete the system including cabling,mounting structures, combiner boxes and water cleaning network. , solar inverters, 22 MW/22MHWh BESS system,33kv undergound line of 800m length, HV3302 kv busbar, transformers and complete connection to 330 kv. control and low voltage network. SCADA ,complete control and monitoring. Operation and maintenance for 15 years