Project Name: Construction of a double‑circuit overhead transmission line at 400 kV,
with a length of 107 km, in the southern region of the Syrian Arab Republic (Rural Damascus – Daraa).
Category : Industry
Client : The General Organization for Electricity Transmission and Distribution – Ministry of Electricity
Date: 2021
Location : Syria


