Construction of a double‑circuit

Project Name: Construction of a double‑circuit overhead transmission line at 400 kV,

with a length of 107 km, in the southern region of the Syrian Arab Republic (Rural Damascus – Daraa).

Category : Industry

Client : The General Organization for Electricity Transmission and Distribution – Ministry of Electricity

Date: 2021

Location : Syria

Leave a Reply

Your email address will not be published. Required fields are marked *