Credibly reintermediate backend ideas for cross-platform models. Continually reintermediate integrated processes through technically sound intellectual capital. Holistically foster superior methodologies without market-driven best practices.
dl.beatsnoop.com-hq-1728639280-bJUpfmkLB1

Project Name: Design, Supply, Installation, Testing and Commissioning for The 15 MWp Electrification of Sabon Gari Market Kano State

Scope of work: the project scope is a Hybrid solar farm consisting of a Hybrid Solar POwer system with 15 MWp PV and 15 MW/15MAWh BESS Lithium-lon Energy Storage with full Eenergy Management systems, and backup Synchronized Systemsof Diesel Generators with a total Capacity of 15 MW using 14 sets of 1100 KVA to cover peak power demand of 7.500kW. the project includes the installation and rehabilitation of existing streetlights and transmission system of cabling and energy.the solar farm is monitored /controlled remotely through Advanced metering infrastructure (AMI) solutions and a high -end SCADA system, and live monitoring is accessible 24/7 through security cameras.Operation and maintenance for 15 years

PHOTO-2023-05-05-12-47-34
PHOTO-2023-05-05-12-47-35 (1)
PHOTO-2023-05-05-12-47-35

Project Name: Renovation of Expertise France Office in Beirut

Scope of work:

1- Demolition in stage 12.
2- Finishing works (Tiling, gypsum board, painting)
3- Conduiting and cabling for power sockets at desks.
4- Conduiting and cabling for low current systems: CCTV. Access controls, intrusion, UPS,
5- 3rd fix works for wiring devices and low current fixtures.
6- Testing and commission for low current systems.
7- Installation of anti-blast film for exterior glazing windows.
8- Installation of roller shades for exterior glazing windows.

20221228_093808
20221228_115313
20221228_144629

Project Name: Qarmat Ali Water Intake and 1st Stage Lift Pump Replacement

Scope of work: Engineering, Procurement, Construction and Commissioning relevant to the Qarmat Ali Intake & 1st stage lift pumping station (Plant Capacity : 3.6MMBPD), to be installed in Qarmat Ali area which is 4km from Basra airport (Basra – IRAQ).
The scope of the Project includes the construction of a new combined Qarmat Ali Water Intake Structure and1st Lift Pump Station (QAWIS) together with supporting infrastructure which once up and running shall replace the existing facilities. The existing 1st lift station will be operational up to the point where the new facilities have been fully commissioned and ready of operation.

Project Name: CAMCE CONTRACT 1

Scope of  work: Engineering, procurement, construction, commissioning, operation and maintenance,(EPCCCOM ) of a central processing facility (CPF) GAS treatment and auxiliary systems in Basra Iraq

Project Name: Construction of Erosion Control Works at Umuachiri-Umuapu in Isialangwa South LGA, Abia State

Scope of work: The project includes site clearance, excavation, backfilling, reinforced concrete, steel reinforcing, water stop, stone pitching, gabion walls, structures vegetation and plantation, fence, and irrigation network

ezgif.com-webp-to-jpg

Project Name: Karantina Hospital – Lebanon Hybrid System with a total capacity of 650 kWp Solar Power with a containerized Lithium Storage System with a total capacity 200kW/1.3MWh to ensure full dependency on renewables to power the hospital.

Scope of work: Designed , supplied ,erected, installed , tested, commissioned

Project Name: CAMCE CONTRACT 2

Scope of work: Engineering, procurement, construction, commissioning, operation and maintenance,(EPCCCOM ) of a central processing facility (CPF) OIL treatment and auxiliary systems in Basra Iraq

PHOTO-2023-09-08-15-18-29

Project Name: DAR EL AMAL UNIVERSITY AND TEACHING HOSPITAL HYBRID SYSTEM with total capacity of 1.8 MWp Solar Power with a containerized Lithium storage system with a total of capacity 1.1MWh/1.05 MW to ensure full dependency on renewables to power to the University hospital

Scope of work: Designed , supplied ,erected, installed , tested, commissioned