Project Name: Lafia Township Storm Water Management
Scope of work: Construction of Storm Water Network System
Project Name: Lafia Township Storm Water Management
Scope of work: Construction of Storm Water Network System
Project Name: Cash for works based project-construction and training programme-ConTra (construction works for Lot II) Deir El Ahmar-Construction of Boulevard Entrance
Deir El Ahmar Construction of Irrigation pond24000 m3 + water networks
Baadaran waste management plant
Ablah Garden Construction of playground and park
Falougha side walks and stone walls
Scope of work: Deir El Ahmar-Construction of Boulevard Entrance
Deir El Ahmar Construction of Irrigation pond24000 m3 + water networks
Baadaran waste management plant
Ablah Garden Construction of playground and park
Falougha side walks and stone walls
Project Name: International Community School of Baghdad Zayouna Project
Scope of work: The project is a mixed School poject, comprising Kinder Garden, Elementary,Middle, and secondary School.
Spread over a land of : 9200 m2.
At a total construction area : – Basement floors area : 425m2/ -Upper floors area : 13575 m2.
The basement floor contain all the common technical,Water Tanks, water treatments plants, etc
The school spread from ground floor,up to third floor, contain all the entrances lobbies, cafeteria ,administration, back offices, and other facilities.
Along with a closed playground, classrooms, laboratories, and all their related facilities, for all school sections kinder garden, Elementary, Middle, and Secondary.

Project Name: Construction of the (101 km) Malama Rigan Gabas Road in Warafa Federal Constituency, Kano State
Scope of work: The project includes clearing and gubbing, excavation, Backfilling, concrete pipe culverts, Kerbing, stone masonry for open drains in urban areas, reinforced concrete drain covers for open drains in urban areas, stone pitching, stone masonry wall and erosion protection, excavation, backfilling and hand laid rock fill, subbase, road base and garvel wearing course, crushed stone base, bituminous prime coat (MC-30 cutback bitumen), double surface treatment, cyclopean mass concrete, steel reinforcement for structures, cast insitu concrete for bridges, elastomeric bearing, concrete railig, expasion joint -, joint sealant, drainage pipes, stone masonry structures and riprap, gabion boxes, sheathing material from crushed stone type A covered e=with geotextile type I-A, delineators, markers and kilometer posts, guardrails, road signs, road traffic marking and roads studs, grassing, planting of local trees and concrete tile footway

Project Name: Construction of Cooperation Union Center in Jdeydet el Qaytaa – north lebanon
Scope of work: the work consist of completing the construction of the existing municipality faculty located in Jdaidet El Qaytaa
Project Name: Design, Supply, Installation, Testing and Commissioning for The 35MWp Solarization of 132/33kV Injection Substation at Green Economic Zone (GEZ) Marraban Jos Kaduna
Scope of work: 35 MWP Solar Panels with all electrical and civil works to complete the system including cabling,mounting structures, combiner boxes and water cleaning network. , solar inverters, 20 MW/20MHWh BESS system,33kv undergound line of 2 km length, HV132 kv busbar, transformers and complete connection to 132 kv. control and low voltage network. SCADA ,complete control and monitoring. Operation and maintenance for 15 years
Project Name: Berdawni Qaa Rim Solar power plant 1MW
Scope of work: Implementing of 1 MW Solar Power Plant
Project Name: Design, Supply, Installation, Testing and Commissioning for The 30 MWp Solarization of 2 x 60MVA Transmission Substation at Kabba, Kogi State
Scope of work: 30 MWP Solar Panels with all electrical and civil works to complete the system including cabling,mounting structures, combiner boxes and water cleaning network. , solar inverters, 22 MW/22MHWh BESS system,33kv undergound line of 800m length, HV3302 kv busbar, transformers and complete connection to 330 kv. control and low voltage network. SCADA ,complete control and monitoring. Operation and maintenance for 15 years
Project Name: Construction of Luri Bridge NO: 1
Scope of work: Construction of Luri Bridge

Project Name: Wardi Vinery Irrigation water Solar Pumping Station 600KW
Scope of work: Irrigation water Solar Pumping Station 600KW